Chicago & North Shore bathroom remodeling

Bathroom Remodeling in Sauganash, Chicago

Bathrooms for older Sauganash houses - vintage tile, upstairs baths under the roofline, and new primary baths - planned by URB's team in neighboring Lincolnwood.

Specialized remodeling experience

Sauganash bathrooms, from the original tile to a new primary bath.

A bathroom in an older Sauganash house is rarely a blank box. It may still have its original wall and floor tile, a cast-iron tub, a radiator under the window, and plaster walls; it may sit upstairs under a sloped ceiling or dormer; and it is almost always above finished rooms - a dining room, kitchen, or living room - whose ceilings have to stay dry and intact. Many households also want something the house never had: a true primary bath, a second full bath upstairs, or a better powder room on the main floor.

URB plans each bath from the structure and systems around it. Before fixtures are chosen, we look at how drains and vents run through the floor framing, the condition of older supply and drain piping, where the exhaust can realistically be routed, how much headroom a sloped ceiling leaves at the shower and toilet, and whether the original tile is worth keeping. Then waterproofing, layout, storage, lighting, and finishes come together in one construction plan.

Neighborhood context and City permit resources are on our Sauganash service-area page. Regional bath planning lives on bathroom remodeling, and budget framing is in our Chicago bathroom remodel cost guide.

URB Remodeling & Renovation Co. works from 4751 W Touhy Ave, Unit 101, Lincolnwood, a short drive from Sauganash, and has remodeled Chicago and North Shore homes since 1986.

Scope & details

What the project may include.

All specialties →
01

Vintage tile: keep, repair, or replace

Original tile evaluated honestly - condition, cracking, what's behind it, and whether matching repairs are realistic - before deciding to preserve it or start over.

02

Upstairs baths under sloped ceilings

Dormers, knee walls, and sloped ceilings measured so the shower, toilet, and vanity land where there's real headroom, with ventilation routed through the roof or attic.

03

Creating a primary bath

An adjoining bedroom, closet, or hall reworked into a primary bath, with structure, drain routes, and the impact on the rest of the floor plan evaluated together.

04

Drain routes through older floor framing

Drain slope and vent paths planned through wood joists over finished rooms, with older piping assessed and replaced where it's part of the work.

05

Main-floor powder rooms

Powder rooms planned for back halls, under-stair spaces, or reworked closets, with venting and door swings resolved in tight footprints.

06

Radiators, windows & the wet area

Radiator placement, a window inside or beside the shower, and exhaust needs coordinated so heat, light, and moisture control all work.

Bathroom tile and waterproofing detail by URB RemodelingPlan before
construction

Planning priorities

Resolve the conditions that shape the result.

A meaningful scope is specific to the property. Existing construction, applicable permits and inspections, material lead times, access, occupancy, and connected finish work can all influence the correct approach.

Protect the rooms below

An upstairs bath sits over your own finished ceilings. Waterproofing, testing, and plaster protection or repair below are part of the scope, not afterthoughts.

Investigate older plumbing

Older houses may have a mix of original and replaced supply and drain lines. Selective investigation before final drawings shows what can be tied into and what should be replaced.

City of Chicago permits (planning overview)

Chicago's Department of Buildings requires a permit before most construction and repair work begins. For a bath, plumbing, electrical, and nonstructural interior changes may fit worktypes in the City's online Express Permit Program, where a listed licensed contractor must accept the job electronically before the permit issues. Moving walls or other changes that need architectural plans go through Standard Plan Review instead. URB maps the likely path for the address, names the licensed trades (you can check them in the City's licensed contractor lookup), and looks up landmark status and earlier permits where they matter. Overview: DOB Permits. Planning information only - not legal or municipal advice, and no approval is guaranteed.

Keep a bathroom working

In a multi-bath house, the sequence keeps at least one bath usable while another is under construction wherever practical.

A managed renovation

One clear path from idea to completion.

See the full process →
01

Listen

Which bath, what isn't working, what you want to keep, how the household uses it, timing, and investment range.

02

Define

Layout, drain and vent routes, waterproofing, ventilation, City permit path, selections, and the construction sequence.

03

Build

A project manager coordinates trades, inspections, dust control, and protection of floors, stairs, and the rooms below.

04

Complete

A walkthrough of the finished bath, final items addressed, and a clear closeout.

Selected URB work

Craftsmanship you can see. Planning you can feel.

The most successful remodeling projects hold together at every scale—from the overall layout and daily function to alignments, transitions, protection, communication, and the quiet details that make a finished space feel resolved.

“The estimate was detailed and fair, there were no surprises, and the team kept us informed throughout the process.”

Garrett F. Verified client review

Since 1986Chicago-area remodeling experience
ChicagoExplore city service areas
North ShoreExplore suburban service areas
One teamPlanning through final walkthrough

Good questions, clear answers

Planning your bathroom remodeling project.

Does a Sauganash bathroom remodel need a City of Chicago permit?+

Generally yes, when plumbing, electrical, or walls change. Smaller bath scopes may be filed online through the City's Express Permit Program, while plan-based work goes through Standard Plan Review. URB confirms the path for your address before construction is scheduled.

Can we keep our original tile?+

Sometimes. URB checks the tile's condition, what it's set on, and whether repairs can be made convincingly. If keeping it would compromise waterproofing or the new layout, we'll explain the trade-off before work begins.

Can you add a primary bathroom to an older Sauganash home?+

Often, by borrowing space from an adjoining bedroom, closet, or hall. Drain routes through the floor framing, structure, and the effect on the rest of the floor plan are evaluated before a layout is committed.

Our upstairs bath has a sloped ceiling. Will a shower fit?+

It depends on headroom where you'd stand. URB measures the slope and dormer, then places the shower, toilet, and vanity where clearances work, sometimes with a dormer or ceiling change as part of the scope.

Can you convert a cast-iron tub to a walk-in shower?+

Usually, when the floor framing and drain location support it. Removal of the old tub, drain changes, slope, and waterproofing are planned together. More on tub-to-shower conversions.

What about the ceiling below an upstairs bath?+

Protection and any plaster opening or repair below are planned into the scope, and waterproofing is tested before tile covers it.

How much does a Sauganash bathroom remodel cost, and how long does it take?+

It depends on the room's size, how much plumbing and structure change, and selections. URB provides an itemized proposal and a sequence after a site visit; general budget factors are in our Chicago bathroom remodel cost guide.

Do you have an office in Sauganash?+

URB is based at 4751 W Touhy Ave, Unit 101, in neighboring Lincolnwood, a short drive from Sauganash homes.

Let’s talk about your home

Bring us the project that needs experience.

Tell us what you want to change, what is not working, and where you need guidance. We’ll help you understand the right next step. Call (847) 410-2691 or visit 4751 W Touhy Ave, Unit 101, Lincolnwood.

Schedule your consultation